Solar Tower, Australia

SolarMission Technologies are developing the world's first commercial Solar Tower (aka Solar Chimney) to be built in Australia. It will have the capacity to generate up to 200MW of electricity - sufficient to power 200,000 average households.

What is a Solar Tower

A Solar Tower uses the power of the sun and the fact that heat rises to generate zero emission electricity. Sunlight heats the air at the base of very tall tower which then rises and turns an electricity generating turbine. With a very tall tower the updraft effect sucks the heated air even more rapidly upwards increasing the amount of electricity which can be generated.

At ground level a wide air-tight transparent collector is constructed covering a wide area of land to capture as much of the sun's energy as possible using the greenhouse effect. The air in the collector heats up and rises up through the tall chimney built in its centre turning the turbines located near the base of the chimney. The collector stays warm throughout the night enabling significant amounts of electricity to be generated even when it is dark.

Air at 30 degrees Celcius at the edge of the collector is heated up to around 70 degrees Celcius at the centre. The temperature differential between the top and bottom of the tower results in an updraft velocity of around 15 metres per second which means that maintenance crews can do their work without requiring generator down time.

Solar Tower Prototype


Solar Tower Prototype, Spain

A 50kW prototype solar tower (pictured above) was constructed in Spain way back in 1982. This plant 150km south of Madrid had an 800 foot diameter collector and a 600 foot tall 33 foot wide tower. Over the next seven years the solar tower operated for 15,000 hours during which time enormous amounts of tests were undertaken. It proved possible to run the power plant automatically with just one supervisor required, and the concept was proven to be a very reliable means of generating clean electricity.

It was also found that by using heat storage units within the collector space, it is possible to store energy so that electricity can be generated during peak demand - an advantage over traditional photovoltaic solar panel electricity generation. Shutter doors at the top of the collector can be opened and closed automatically to keep or release the stored heat energy. The ground under the glass collector is covered with a heat absorbant membrane to help store energy and make 24-hour operation possible.

200MW Solar Tower Project


Solar Tower, Australia

Results from the prototype solar tower, wind tunnels, and other testing have proved that it is possible to scale up and build far larger solar towers. It has been shown that it is much more efficient to build one massive solar collector and tower rather than many smaller ones. Therefore the $800 million Australian project will have a 1,000 metre tall , 150 metre diameter tower making it easily the tallest man made structure in the world. The tower is a simple high tensile reinforced concrete structure which will last at least 50 years in the dry climate of Australia.

The collector for the 200MW solar tower will be vast with a diameter of approximately five kilometers. The height of the transparent roof of the collector will increase from a minimum of a few metres to much higher toward the base of the tower to direct the heated air up the vertical tower. The material used for the 24 million square metre collector could be glass, polycarbonate, or plastic film.

Construction will take almost three years with the giant solar tower being built on the border of Victoria and New South Wales in the South East corner of Australia. Almost 3,000 construction workers will be involved in building the power plant with just 15 employees required to supervise, run, and maintain the completed site.

The solar tower will reduce carbon dioxide emissions by almost 1 million tonnes per year compared to a 200MW brown-coal powered generator.

More Information about the 200MW Solar Tower

To find out more about the 200MW Solar Tower project click here to view the SolarMission website.
Article Last Modified: 16:58, 27th Mar 2007

Comment on this Article

If you have any comments on this article, please email them to neil@reuk.co.uk.


Recommended Related Articles

People who read this article also enjoyed the following articles:

Molten Salt for Heat Storage
Find out about how molten salt can be used as a heat store
Article Last Modified: 11:15, 18th Feb 2009
heating | solar | general

First European Solar Power Tower
Europe's first commercial concentrated solar tower power plant opens in Spain
Article Last Modified: 19:19, 4th May 2007
solar | news

Introduction to Solar Water Heating
Find out more about the benefits of solar water heating.
Article Last Modified: 12:00, 20th Dec 2006
heating | solar

© 2006-2010 REUK - All Rights Reserved
Page Last Updated on 11th March 2010 at 09:30:25am

Latest
Articles


Power Predictor from Better Generation
Find out about the new Power Predictor from Better Generation - solar and wind power data logger
wind
09:30, 11th Mar 2010

Review of Wind Power Peter Musgrove
A review of Wind Power by Peter Musgrove - Cambridge University Press
wind
13:48, 10th Mar 2010

Maximising Air Conditioner Efficiency
Find out how to use air conditioning efficiently
energy efficiency
10:36, 2nd Mar 2010

Energenie 30 Minute Rundown Timer
A device to automatically switch off power to a socket after 30 minutes
shopping
11:35, 27th Feb 2010

UK Renewable Energy Degree Courses
Study renewable energy at university in the UK
education
16:53, 17th Feb 2010

Wireless Electricity Monitors
Up to date details of the wireless electricity monitors for sale in the UK
shopping
16:10, 16th Feb 2010

Investing in Renewable Energy Companies
Invest money in the UK renewable energy sector
general
16:53, 15th Feb 2010

See and Save Domestic Electricity Monitor
Product review of the See & Save Domestic Electricity Monitor
shopping
13:47, 13th Feb 2010



REUK Shop

Popular Items


REUK SUPER TIMER
User programmable 12V powered 10A rated repeating relay timer. 1 second to 99 hours ON and OFF times
£19.99 each.
Complete Circuits



SOLAR PUMP CONTROLLER WITH RELAY
Solar water heating system microprocessor controlled circuit with fitted 10A relay
£25.99 each.
Complete Circuits



12 VOLT 5 WATT SOLAR PANEL
Waterproof 12 Volt 5 Watt Solar Panel with aluminium frame - 290mm x 205mm x 17mm with fitted 5m leads
£33.99 each.
Solar Power



300 WATT POWER INVERTER
Convert 12V DC battery power into 230 AC to power portable televisions, computers, video recorders etc. 300 Watt power rating - peak power 600 Watts
£29.99 each.
Renewable Energy System Parts



CONVERTED PROGRAMMABLE DIGITAL TIMER RELAY
Mains powered programmable timer converted to low voltage with relay board
£21.99 each.
Renewable Energy System Parts



12 VOLT REGULATOR
Supply a fixed 12.0 Volt DC to your devices (up to 1 Amp output)
£4.99 each.
Complete Circuits



MR16 CERAMIC BULB HOLDER
Bulb holder for 12 Volt LED spotlight bulbs
£1.39 each.
Energy Efficient Lighting